{"id":22676,"date":"2022-06-24T21:12:47","date_gmt":"2022-06-24T21:12:47","guid":{"rendered":"https:\/\/www.mediskin-edegem.be\/?p=22676"},"modified":"2025-04-21T06:19:15","modified_gmt":"2025-04-21T06:19:15","slug":"mil-hdbk-61a-6-1-configuration-management-exercise","status":"publish","type":"post","link":"https:\/\/www.mediskin-edegem.be\/?p=22676","title":{"rendered":"Mil-hdbk-61a 6 1 Configuration Management Exercise"},"content":{"rendered":"<p>There could additionally be multiple configuration management authorities for a  \t\t\t\tproduct with more than one consumer; each being a configuration control   \t\t\t\tauthority for a given contract.<\/p>\n<p><img decoding=\"async\" class='aligncenter' style='display: block;margin-left:auto;margin-right:auto;' src=\"https:\/\/globalcloudteam.com\/wp-content\/uploads\/2020\/08\/fs-Magic-Orange-Cost-transparency-unlocked.xl_-768x424.jpg\" width=\"308px\" alt=\"ccb configuration control board\"\/><\/p>\n<p>in their implementation. Configuration change management is a process to manage accredited designs and the implementation of approved changes. Configuration change management is achieved through the systematic proposal, justification, and analysis of proposed modifications followed by incorporation of accredited modifications <a href=\"https:\/\/www.globalcloudteam.com\/glossary\/configuration-control-board-ccb\/\">configuration control board<\/a> and verification of implementation. Implementing configuration change management in a given program\/project requires distinctive information of the program\/project goals and requirements. The first step establishes a robust and well-disciplined internal NASA Configuration Control Board (CCB) system, which is chaired by someone with program\/project change authority.<\/p>\n<p>It reveals the configuration management process divided into three segments, \t\t\t\twhich are detailed in Figures 6-2, 6-3 and 6-4, respectively. The manager leads the group, coordinates the actions and oversees all elements of change. Table 6-1 offers an activity guide for the analysis of a  \t\t\t\tconfiguration management process. When a variety of adjustments have amassed, the TWG recommends a brand new DM2 baseline model be established and released.<\/p>\n<p>If it is not the CDCA for a given  \t\t\t\tdocument, it does not have the authority to approve a proposed change  \t\t\t\tto that document, and subsequently must solicit ECP approval from the  \t\t\t\tapplicable CDCA, or select an alternate design.<\/p>\n<p>or subject matter experts from the Government group, e.g. \t\t\t\tIntegrated Program Team (IPT). In efficiency based mostly acquisition, the definition of each class<\/p>\n<h2>Nasa\u2019s Planetary Radar Images Slowly Spinning Asteroid<\/h2>\n<p>Create a configuration management follow that will provide ongoing value to the organization. Joseph is a worldwide finest apply coach and marketing consultant with over 14 years corporate expertise. His passion is partnering with organizations around the globe via training, development, adaptation, streamlining and benchmarking their strategic and operational insurance policies and processes consistent with greatest practice frameworks and international standards.<\/p>\n<p><img decoding=\"async\" class='aligncenter' style='display: block;margin-left:auto;margin-right:auto;' src=\"https:\/\/globalcloudteam.com\/wp-content\/uploads\/2022\/10\/critical-features-ai-19-1-768x421.jpg\" width=\"301px\" alt=\"ccb configuration control board\"\/><\/p>\n<p>enables them to provide pertinent input. The CCB may, every so often, establish technical working groups (TWG), as required, to supervise, evaluate, and make recommendations to the board on specific technical elements of the CM Program, or configuration items. TWGs present the subject-matter expertise essential to make certain that paperwork, the DM2, and other merchandise under configuration control of the CCB are maintained in a accountable method.<\/p>\n<h2>Observe Nasa<\/h2>\n<p>of the change before the choice is made. When a call is rendered,  \t\t\t\tthe CCB chairperson approves a CCB directive, or equal letter\/memorandum,  \t\t\t\tdirecting the appropriate implementing actions to be accomplished.<\/p>\n<div style='text-align:center'><iframe width='562' height='318' src='https:\/\/www.youtube.com\/embed\/6aJ8qn8yV9U' frameborder='0' alt='ccb configuration control board' allowfullscreen><\/iframe><\/div>\n<p>Upon, approval by the CCB, the model new DM2 is revealed along with a document of adjustments from final baseline and a model new working copy is setup. Configuration Control Boards (CCB) could be established to handle important adjustments to CM-controlled items. CCBs must evaluation, approve, disapprove, defer, escalate, or remand change requests (CR) to baselined objects. These embrace the strategy and procedures for configuration administration, the listing of recognized configuration items, descriptions of the configuration objects, change requests, disposition of the requests, rational for inclinations, reviews, and audit outcomes. Usually, if top leaders or C-suite executives sit within the CAB, then it has highest authority. The organization\u2019s change administration policy will define the CAB\u2019s structure and its scope, which can embody anything from proposals and deployments to modifications to roles and documentation.<\/p>\n<h2>Mil-hdbk-61a: Configuration Control<\/h2>\n<p>A CCB secretariat schedules conferences,  \t\t\t\tdistributes agendas, records CCB decisions, and distributes minutes  \t\t\t\tand directives to events who are assigned implementing action(s)<\/p>\n<p><img decoding=\"async\" class='aligncenter' style='display: block;margin-left:auto;margin-right:auto;' src=\"https:\/\/globalcloudteam.com\/wp-content\/uploads\/2023\/01\/tech-lead-for-your-developer-team-img-2.webp\" width=\"309px\" alt=\"ccb configuration control board\"\/><\/p>\n<p>modification to authorize the contractor to proceed with implementation  \t\t\t\tof the accredited class I ECP or major\/critical deviation. Through the configuration management process, the complete impression of proposed  \t\t\t\tengineering changes and deviations is recognized and accounted for<\/p>\n<p>TWGs, when tasked by the CCB, present detailed and comprehensive technical review of proposed modifications and proposals to the CCB on action(s) to be taken that result from really helpful changes. A Change Control Board (CCB), also known as the configuration control board, is a bunch of individuals, largely found in software-related tasks. The group is answerable for recommending or making decisions on requested modifications to baselined work. Anyone who&#8217;s responsible for interacting with customers needs to have a spot on the change management board. They are on the entrance lines of the business, coping with those that actually use the services or products and have an intimate understanding of whether or not a change will have a positive or negative impact. DM2 change requests (action items) can be raised by any of the working group members or circulate down from the CCB.<\/p>\n<p>physically maintains and stores  the document. The CDCA is the group  \t\t\t\tthat has the decision authority over the contents of the document,  \t\t\t\treflecting proprietary or information rights to the data <a href=\"https:\/\/www.globalcloudteam.com\/\">https:\/\/www.globalcloudteam.com\/<\/a> that the  \t\t\t\tdoc accommodates. The CDCA may be a Government exercise or a contractor,<\/p>\n<h2>What Is A Change Control Board?<\/h2>\n<p>They can not  \t\t\t\tauthorize change to either, but they might take part within the change  \t\t\t\tmanagement course of if requested for input by either the configuration management  \t\t\t\tauthority that&#8217;s the CDCA, or by the Government lead software<\/p>\n<ul>\n<li>This scenario is exacerbated in corporations with legacy techniques and constructions that prohibit the flexibility for change that digital transformation requires.<\/li>\n<li>\t\t\t\tstandards should be applied to the entire CI functions through coordination <\/li>\n<li>This handbook views these concepts from each program administration <\/li>\n<li>\t\t\t\tall be reviewed by the contractor to determine if additionally they impression <\/li>\n<\/ul>\n<p>masking the portion of the process concerned with Government review  \t\t\t\tand disposition of contractor submitted ECPs and RFDs. It illustrates  \t\t\t\tnative Government representative evaluation and concurrence with class<\/p>\n<p>a system or configuration item. Configuration control is an important self-discipline  \t\t\t\tthroughout this system life cycle. Figure 6-1 illustrates  \t\t\t\ta top-level exercise mannequin of the configuration management process.<\/p>\n<p>Mostly involved in decision making for deployments to IT manufacturing environments, the Change Advisory Board (CAB) is a physique constituted to assist the authorization of adjustments and to assist change management in the evaluation, prioritization, and scheduling of adjustments. When it comes to management and control of modifications to companies and repair elements, one of the largest challenges is determining who has the authority to make change decisions. Ultimately, looking for win-win options that steadiness the needs and pursuits of all parties involved while sustaining the project goals is essential. Lastly, speaking the CCB decisions clearly and promptly to all related stakeholders with explanations of causes and implications will help foster belief, cooperation, and satisfaction among all concerned. Before you start any CCB assembly or evaluate, be sure that everybody involved knows their roles and responsibilities.<\/p>\n<p>The voting membership of the Board consists of 1 consultant from each main user of DPAS. Non-voting members can take part in conferences and communications but cannot vote on priorities for the System Change Requests (SCRs). In these cases, an Emergency Change Advisory Board (eCAB) can be formed as a temporary subset of the routine CAB. The eCAB might embody some or all people from the CAB, and this group will meet outside the conventional schedule to evaluate the mandatory emergency change(s).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>There could additionally be multiple configuration management authorities for a product with more than one consumer; each being a configuration control authority for a given contract. in their implementation. Configuration change management is a process to manage accredited designs and the implementation of approved changes. Configuration change management is achieved through the systematic proposal, justification,&hellip;&nbsp;<a href=\"https:\/\/www.mediskin-edegem.be\/?p=22676\" rel=\"bookmark\">Read More &raquo;<span class=\"screen-reader-text\">Mil-hdbk-61a 6 1 Configuration Management Exercise<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","neve_meta_sidebar":"","neve_meta_container":"","neve_meta_enable_content_width":"","neve_meta_content_width":0,"neve_meta_title_alignment":"","neve_meta_author_avatar":"","neve_post_elements_order":"","neve_meta_disable_header":"","neve_meta_disable_footer":"","neve_meta_disable_title":"","footnotes":""},"categories":[29],"tags":[],"class_list":["post-22676","post","type-post","status-publish","format-standard","hentry","category-software-development-6"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Mil-hdbk-61a 6 1 Configuration Management Exercise - MediSkin - Edegem<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mediskin-edegem.be\/?p=22676\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mil-hdbk-61a 6 1 Configuration Management Exercise - MediSkin - Edegem\" \/>\n<meta property=\"og:description\" content=\"There could additionally be multiple configuration management authorities for a product with more than one consumer; each being a configuration control authority for a given contract. in their implementation. Configuration change management is a process to manage accredited designs and the implementation of approved changes. Configuration change management is achieved through the systematic proposal, justification,&hellip;&nbsp;Read More &raquo;Mil-hdbk-61a 6 1 Configuration Management Exercise\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mediskin-edegem.be\/?p=22676\" \/>\n<meta property=\"og:site_name\" content=\"MediSkin - Edegem\" \/>\n<meta property=\"article:published_time\" content=\"2022-06-24T21:12:47+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-21T06:19:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/globalcloudteam.com\/wp-content\/uploads\/2020\/08\/fs-Magic-Orange-Cost-transparency-unlocked.xl_-768x424.jpg\" \/>\n<meta name=\"author\" content=\"Barbara_jacqmain@hotmail.com\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Barbara_jacqmain@hotmail.com\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/?p=22676#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/?p=22676\"},\"author\":{\"name\":\"Barbara_jacqmain@hotmail.com\",\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/#\\\/schema\\\/person\\\/43a9f413849fdb1ef6e4e06121021770\"},\"headline\":\"Mil-hdbk-61a 6 1 Configuration Management Exercise\",\"datePublished\":\"2022-06-24T21:12:47+00:00\",\"dateModified\":\"2025-04-21T06:19:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/?p=22676\"},\"wordCount\":1186,\"publisher\":{\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/?p=22676#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/globalcloudteam.com\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/fs-Magic-Orange-Cost-transparency-unlocked.xl_-768x424.jpg\",\"articleSection\":[\"Software development\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/?p=22676\",\"url\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/?p=22676\",\"name\":\"Mil-hdbk-61a 6 1 Configuration Management Exercise - MediSkin - Edegem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/?p=22676#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/?p=22676#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/globalcloudteam.com\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/fs-Magic-Orange-Cost-transparency-unlocked.xl_-768x424.jpg\",\"datePublished\":\"2022-06-24T21:12:47+00:00\",\"dateModified\":\"2025-04-21T06:19:15+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/?p=22676#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.mediskin-edegem.be\\\/?p=22676\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/?p=22676#primaryimage\",\"url\":\"https:\\\/\\\/globalcloudteam.com\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/fs-Magic-Orange-Cost-transparency-unlocked.xl_-768x424.jpg\",\"contentUrl\":\"https:\\\/\\\/globalcloudteam.com\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/fs-Magic-Orange-Cost-transparency-unlocked.xl_-768x424.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/?p=22676#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mil-hdbk-61a 6 1 Configuration Management Exercise\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/#website\",\"url\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/\",\"name\":\"MediSkin - Edegem\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/#organization\",\"name\":\"MediSkin Edegem\",\"url\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/wp-content\\\/uploads\\\/2021\\\/07\\\/LOGO-OFFICIAL-02.png\",\"contentUrl\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/wp-content\\\/uploads\\\/2021\\\/07\\\/LOGO-OFFICIAL-02.png\",\"width\":4501,\"height\":4500,\"caption\":\"MediSkin Edegem\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/#\\\/schema\\\/person\\\/43a9f413849fdb1ef6e4e06121021770\",\"name\":\"Barbara_jacqmain@hotmail.com\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/38b85c106c5860f2085919a448703fe66f80b0148e54b0742b0f7cec35a226ca?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/38b85c106c5860f2085919a448703fe66f80b0148e54b0742b0f7cec35a226ca?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/38b85c106c5860f2085919a448703fe66f80b0148e54b0742b0f7cec35a226ca?s=96&d=mm&r=g\",\"caption\":\"Barbara_jacqmain@hotmail.com\"},\"sameAs\":[\"https:\\\/\\\/www.mediskin-edegem.be\"],\"url\":\"https:\\\/\\\/www.mediskin-edegem.be\\\/?author=1\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Mil-hdbk-61a 6 1 Configuration Management Exercise - MediSkin - Edegem","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mediskin-edegem.be\/?p=22676","og_locale":"en_US","og_type":"article","og_title":"Mil-hdbk-61a 6 1 Configuration Management Exercise - MediSkin - Edegem","og_description":"There could additionally be multiple configuration management authorities for a product with more than one consumer; each being a configuration control authority for a given contract. in their implementation. Configuration change management is a process to manage accredited designs and the implementation of approved changes. Configuration change management is achieved through the systematic proposal, justification,&hellip;&nbsp;Read More &raquo;Mil-hdbk-61a 6 1 Configuration Management Exercise","og_url":"https:\/\/www.mediskin-edegem.be\/?p=22676","og_site_name":"MediSkin - Edegem","article_published_time":"2022-06-24T21:12:47+00:00","article_modified_time":"2025-04-21T06:19:15+00:00","og_image":[{"url":"https:\/\/globalcloudteam.com\/wp-content\/uploads\/2020\/08\/fs-Magic-Orange-Cost-transparency-unlocked.xl_-768x424.jpg","type":"","width":"","height":""}],"author":"Barbara_jacqmain@hotmail.com","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Barbara_jacqmain@hotmail.com","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.mediskin-edegem.be\/?p=22676#article","isPartOf":{"@id":"https:\/\/www.mediskin-edegem.be\/?p=22676"},"author":{"name":"Barbara_jacqmain@hotmail.com","@id":"https:\/\/www.mediskin-edegem.be\/#\/schema\/person\/43a9f413849fdb1ef6e4e06121021770"},"headline":"Mil-hdbk-61a 6 1 Configuration Management Exercise","datePublished":"2022-06-24T21:12:47+00:00","dateModified":"2025-04-21T06:19:15+00:00","mainEntityOfPage":{"@id":"https:\/\/www.mediskin-edegem.be\/?p=22676"},"wordCount":1186,"publisher":{"@id":"https:\/\/www.mediskin-edegem.be\/#organization"},"image":{"@id":"https:\/\/www.mediskin-edegem.be\/?p=22676#primaryimage"},"thumbnailUrl":"https:\/\/globalcloudteam.com\/wp-content\/uploads\/2020\/08\/fs-Magic-Orange-Cost-transparency-unlocked.xl_-768x424.jpg","articleSection":["Software development"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.mediskin-edegem.be\/?p=22676","url":"https:\/\/www.mediskin-edegem.be\/?p=22676","name":"Mil-hdbk-61a 6 1 Configuration Management Exercise - MediSkin - Edegem","isPartOf":{"@id":"https:\/\/www.mediskin-edegem.be\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.mediskin-edegem.be\/?p=22676#primaryimage"},"image":{"@id":"https:\/\/www.mediskin-edegem.be\/?p=22676#primaryimage"},"thumbnailUrl":"https:\/\/globalcloudteam.com\/wp-content\/uploads\/2020\/08\/fs-Magic-Orange-Cost-transparency-unlocked.xl_-768x424.jpg","datePublished":"2022-06-24T21:12:47+00:00","dateModified":"2025-04-21T06:19:15+00:00","breadcrumb":{"@id":"https:\/\/www.mediskin-edegem.be\/?p=22676#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mediskin-edegem.be\/?p=22676"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mediskin-edegem.be\/?p=22676#primaryimage","url":"https:\/\/globalcloudteam.com\/wp-content\/uploads\/2020\/08\/fs-Magic-Orange-Cost-transparency-unlocked.xl_-768x424.jpg","contentUrl":"https:\/\/globalcloudteam.com\/wp-content\/uploads\/2020\/08\/fs-Magic-Orange-Cost-transparency-unlocked.xl_-768x424.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/www.mediskin-edegem.be\/?p=22676#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mediskin-edegem.be\/"},{"@type":"ListItem","position":2,"name":"Mil-hdbk-61a 6 1 Configuration Management Exercise"}]},{"@type":"WebSite","@id":"https:\/\/www.mediskin-edegem.be\/#website","url":"https:\/\/www.mediskin-edegem.be\/","name":"MediSkin - Edegem","description":"","publisher":{"@id":"https:\/\/www.mediskin-edegem.be\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mediskin-edegem.be\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.mediskin-edegem.be\/#organization","name":"MediSkin Edegem","url":"https:\/\/www.mediskin-edegem.be\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mediskin-edegem.be\/#\/schema\/logo\/image\/","url":"https:\/\/www.mediskin-edegem.be\/wp-content\/uploads\/2021\/07\/LOGO-OFFICIAL-02.png","contentUrl":"https:\/\/www.mediskin-edegem.be\/wp-content\/uploads\/2021\/07\/LOGO-OFFICIAL-02.png","width":4501,"height":4500,"caption":"MediSkin Edegem"},"image":{"@id":"https:\/\/www.mediskin-edegem.be\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.mediskin-edegem.be\/#\/schema\/person\/43a9f413849fdb1ef6e4e06121021770","name":"Barbara_jacqmain@hotmail.com","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/38b85c106c5860f2085919a448703fe66f80b0148e54b0742b0f7cec35a226ca?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/38b85c106c5860f2085919a448703fe66f80b0148e54b0742b0f7cec35a226ca?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/38b85c106c5860f2085919a448703fe66f80b0148e54b0742b0f7cec35a226ca?s=96&d=mm&r=g","caption":"Barbara_jacqmain@hotmail.com"},"sameAs":["https:\/\/www.mediskin-edegem.be"],"url":"https:\/\/www.mediskin-edegem.be\/?author=1"}]}},"_links":{"self":[{"href":"https:\/\/www.mediskin-edegem.be\/index.php?rest_route=\/wp\/v2\/posts\/22676","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mediskin-edegem.be\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mediskin-edegem.be\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mediskin-edegem.be\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mediskin-edegem.be\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=22676"}],"version-history":[{"count":1,"href":"https:\/\/www.mediskin-edegem.be\/index.php?rest_route=\/wp\/v2\/posts\/22676\/revisions"}],"predecessor-version":[{"id":22677,"href":"https:\/\/www.mediskin-edegem.be\/index.php?rest_route=\/wp\/v2\/posts\/22676\/revisions\/22677"}],"wp:attachment":[{"href":"https:\/\/www.mediskin-edegem.be\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=22676"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mediskin-edegem.be\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=22676"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mediskin-edegem.be\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=22676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}